Page 49 - Liquid Penetration Inspection
P. 49

Diploma in Mechanical Engineering (Material)


                                              LIQUID PENETRATION INSPECTION




       www.pis.edu.my


                                               Principles of liquid penetrant inspection



            The function of the developer is very important in a
                                               1. Temperature control
            penetrant inspection. In order to accomplish its functions, a

                                               2. Penetrant quality control
            developer must adhere to the part surface and result in a
                                               3. Dwell quality control
            uniform, highly porous layer with many paths for the

                                               4. Emulsifier path quality control
            penetrant to be moved due to capillary action. Developers
            are either applied wet or dry, but the desired end result is
                                               5. Wash quality control

            always a uniform, highly porous, surface layer.
                                               6. Drying process quality control

                                               7. Developer quality control

















                                                   peneraju • ilmu • sejagat
   44   45   46   47   48   49   50   51   52   53   54