Page 46 - Liquid Penetration Inspection
P. 46

Diploma in Mechanical Engineering (Material)


                                              LIQUID PENETRATION INSPECTION




       www.pis.edu.my


                                               Principles of liquid penetrant inspection





                                               1. Temperature control


                                               2. Penetrant quality control

                                               3. Dwell quality control


                                               4. Emulsifier path quality control

                                               5. Wash quality control
            Hydrophilic emulsifiers have less tolerance for penetrant

                                               6. Drying process quality control
            contamination. The penetrant tolerance varies with

                                               7. Developer quality control
            emulsifier concentration and the type of contaminating
            penetrant. In some cases, as little as 1% (by volume)


            penetrant contamination can seriously affect the

            performance of an emulsifier.







                                                   peneraju • ilmu • sejagat
   41   42   43   44   45   46   47   48   49   50   51