Page 47 - Liquid Penetration Inspection
P. 47

Diploma in Mechanical Engineering (Material)


                                              LIQUID PENETRATION INSPECTION




       www.pis.edu.my


                                               Principles of liquid penetrant inspection





                                               1. Temperature control


                                               2. Penetrant quality control

                                               3. Dwell quality control


                                               4. Emulsifier path quality control

                                               5. Wash quality control


                                               6. Drying process quality control
            The wash temperature, pressure and time are three

                                               7. Developer quality control
            parameters that are typically controlled in penetrant
            inspection process specification. A coarse spray or an


            immersion wash tank with air agitation is often used.










                                                   peneraju • ilmu • sejagat
   42   43   44   45   46   47   48   49   50   51   52