Page 45 - Liquid Penetration Inspection
P. 45

Diploma in Mechanical Engineering (Material)


                                              LIQUID PENETRATION INSPECTION




       www.pis.edu.my


                                               Principles of liquid penetrant inspection





                                               1. Temperature control


                                               2. Penetrant quality control

                                               3. Dwell quality control


                                               4. Emulsifier path quality control

                                               5. Wash quality control
            Lipophilic emulsifiers mix with penetrants but when the

                                               6. Drying process quality control
            concentration of penetrant contamination in the emulsifier

                                               7. Developer quality control
            becomes too great, the mixture will not function effectively
            as a remover. Standards require that lipophilic emulsifiers


            be capable of 20% penetrant contamination without a

            reduction in performance.







                                                   peneraju • ilmu • sejagat
   40   41   42   43   44   45   46   47   48   49   50